Giant Tiger
Case Study
Client
Giant Tiger
Sector
Commercial
Location
Johnstown, ON, CA
Before
Preparation
As this was a new-build, the ground was prepared in accordance with Ecoraster specifications and guidelines.
Installation
Ecoraster E50 was chosen for this project and the paver grid was cut to conform to the existing structures in place.
After
The team at Giant Tiger was impressed with the efficient Ecoraster installation and immediate ground stabilization to their warehouse floor. With the new ground reinforcement and outdoor drainage system now in place, stormwater management has significantly improved, and runoff is no longer an issue.
Project Gallery
Explore the photos below that highlight how Ecoraster products were installed, as well as the results we were able to achieve for the park.